Configuring Scheduler and SMTP Services
As an optional feature, InfoGo allows you to schedule report production and delivery via email.
The scheduling feature is dependent on the Logi Scheduler, a service that must be installed with Logi Info. If the Scheduler is not installed, you can re-run the Logi Info installer at any time and install it.
Use the following steps to configure these features:
- Configure the Scheduler: In the InfoGo application's _Settings definition, uncomment the "goScheduler" element, as shown above. Its default attributes will work in most scenarios. For more detailed information about other configurations, see Using Logi Scheduler.
- Enable the Scheduler icons: In the _Settings definition, set the "goSchedulerEnabled" constant to True, as shown above. This controls the appearance of the Scheduler icons for items in the Home page.
- Uncomment the "goMail" element and provide an email server name, as shown above.
Once scheduling has been configured and enabled, a scheduling icon will appear for each Report item in the Home page resource list, as shown above. Users can click this icon at runtime to schedule report production and delivery.